Abstract
"The manufacture of similar products in two different plants results in duplication of effort, high production costs and difficulty in maintaining uniformity. The bringing of Philadelphia production of Battleship, Jaspe and Cork Carpet to the Trenton Plant will enable all calendered goods to be produced under single control, thus insuring uniformity and better supervision"--Introduction, page 8.
Advisor(s)
Steinmesch, Jesse Herman
Department(s)
Mining Engineering
Degree Name
Professional Degree in Mining Engineering
Publisher
Missouri School of Mines and Metallurgy
Publication Date
1935
Pagination
iv, 54 pages, 6 plates
Rights
© 1935 H. S. Pence, All rights reserved.
Document Type
Thesis - Open Access
File Type
text
Language
English
Subject Headings
Floor coverings industry -- ManagementLinoleum industry -- ManagementProduction management -- Case studies
Thesis Number
T 650
Print OCLC #
5964498
Electronic OCLC #
664136811
Recommended Citation
Pence, Harry Simanton, "A study in the production of calendered linoleum" (1935). Professional Degree Theses. 149.
https://scholarsmine.mst.edu/professional_theses/149