Matching Longwall and Continuous Miner Productivity Requirements

Abstract

Matching the productivity gains of continuous mining machines with the increasing performance levels achieved by longwall units has required creative thinking to assure that development is completed in time for uninterrupted longwall production. By using management information systems to coordinate support operations, the most productive planning decisions can be made. This paper focuses on the role of computer technology tools in achieving improved productivity from both longwall and continuous miner sections. The primary emphasis is on the planning process and the methodology developed to guarantee the best allocation of management and manpower resources. -Authors

Department(s)

Mining Engineering

International Standard Serial Number (ISSN)

0026-5187

Document Type

Article - Journal

Document Version

Citation

File Type

text

Language(s)

English

Rights

© 1994 Society for Mining, Metallurgy & Exploration Inc. (SME), All rights reserved.

Publication Date

01 Jan 1994

This document is currently not available here.

Share

 
COinS