Masters Theses

Effect of system control factors on response variables in Just in Time (JIT) and Theory of Constraints (TOC) systems

Abstract

"Various researchers have discussed the advantages of implementing Just in Time (JIT) and Theory of Constraints (TOC) in manufacturing environment and benefits obtained...This study considers various control factors such as strategy, processing time variability, demand variability and part variety. Various manufacturing scenarios are created by the combination of factors and response variables...This study advocates different strategy for different manufacturing scenarios"--Abstract, page iii.

Department(s)

Mechanical and Aerospace Engineering

Degree Name

M.S. in Manufacturing Engineering

Publisher

University of Missouri--Rolla

Publication Date

Fall 2004

Pagination

ix, 77 pages

Note about bibliography

Includes bibliographical references.

Rights

© 2004 Narasimhan SrinivasaRaghavan, All rights reserved.

Document Type

Thesis - Citation

File Type

text

Language

English

Subject Headings

Just-in-time systemsTheory of constraints (Management)Analysis of variance

Thesis Number

T 8649

Print OCLC #

62256103

This document is currently not available here.

Share My Thesis If you are the author of this work and would like to grant permission to make it openly accessible to all, please click the button above.

Share

 
COinS