Location

Arlington, Virginia

Date

13 Aug 2008, 5:15pm - 6:45pm

Abstract

Spread footing foundation system is widely used here in Jordan. Cheap cost compare with other foundation type and accumulative practice makes them preferable in the construction industry. Overdesign of such footing and the lack of effective heave prediction lead to an unexpected outcome. Several residences building in Irbid province were suffered from severe crack. Subsequently, owners of these houses are enforced to leave their homes. In this paper a case study of a damaged one-storey reinforced concrete structure presented. The investigation shown that, the spread footings in the damaged part of the structure are over design, while the grade beam used to connect these footing is under design.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

6th Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

Missouri University of Science and Technology

Document Version

Final Version

Rights

© 2008 Missouri University of Science and Technology, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Aug 11th, 12:00 AM Aug 16th, 12:00 AM

Heave Problem in Spread Footing in Jordanian Expansive Soil

Arlington, Virginia

Spread footing foundation system is widely used here in Jordan. Cheap cost compare with other foundation type and accumulative practice makes them preferable in the construction industry. Overdesign of such footing and the lack of effective heave prediction lead to an unexpected outcome. Several residences building in Irbid province were suffered from severe crack. Subsequently, owners of these houses are enforced to leave their homes. In this paper a case study of a damaged one-storey reinforced concrete structure presented. The investigation shown that, the spread footings in the damaged part of the structure are over design, while the grade beam used to connect these footing is under design.