This paper introduces a case where pipe piles failed during construction. The accident happened when constructing the Jiaoxi Pumping Station project in the southern China. The site consists of very soft sludge and silt deposits. Pipe piles were used as foundation under the station structure. The installed pipe piles were observed to show significant inclination during the construction. A forensic investigation was performed. The driving forces for pipe pile failure were attributed to the lateral load induced by the excavation activities. Small strain integrity test and inclination measurement were taken to determine the location of breakage and the extent of inclination. The test results combined with theoretical analysis were able to determine the cause of pipe pile failure. Remediation measures were designed and implemented based on the results of forensic analyses. Recommendations were proposed to guide construction activities on soft soil deposit. The results of implementing these guidelines during remediation construction were satisfactory.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
6th Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
Missouri University of Science and Technology
Document Version
Final Version
Rights
© 2008 Missouri University of Science and Technology, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Yu, Xiong Bill and Huang, Yuewen, "Forensic on Construction Induced Failure of Pipe Pile Foundations" (2008). International Conference on Case Histories in Geotechnical Engineering. 3.
https://scholarsmine.mst.edu/icchge/6icchge/session08b/3
Forensic on Construction Induced Failure of Pipe Pile Foundations
Arlington, Virginia
This paper introduces a case where pipe piles failed during construction. The accident happened when constructing the Jiaoxi Pumping Station project in the southern China. The site consists of very soft sludge and silt deposits. Pipe piles were used as foundation under the station structure. The installed pipe piles were observed to show significant inclination during the construction. A forensic investigation was performed. The driving forces for pipe pile failure were attributed to the lateral load induced by the excavation activities. Small strain integrity test and inclination measurement were taken to determine the location of breakage and the extent of inclination. The test results combined with theoretical analysis were able to determine the cause of pipe pile failure. Remediation measures were designed and implemented based on the results of forensic analyses. Recommendations were proposed to guide construction activities on soft soil deposit. The results of implementing these guidelines during remediation construction were satisfactory.