Location
Arlington, Virginia
Date
15 Aug 2008, 11:00am - 12:30pm
Abstract
A part of Toulouse’s underground line B has been excavated by a 7.8 meters diameter earth-pressure balance machine. A comprehensive monitoring section has been installed in the Compans garden at a point where the tunnel cover is 12.8-meter and is running through overconsolidated clayey molasses underlying a 6.8 meters layer of made ground and gravels. The monitoring devices give full information on the ground movements above the tunnel and on deformations of the tunnel lining. Vertical movements are measured by 5 multipoint borehole extensometers with automatic data acquisition (every 5 seconds when the TBM crosses the monitoring section). At the end of each excavation phase, a high precision levelling of the borehole extensometer heads is performed in order to determine the total vertical displacements. Horizontal movements are measured by 3 inclinometers, one in the axis of the tunnel and the others on its sides, 2.3 meters away from the tunnel extrados. One of these inclinometers is 42 m long, i.e. 21.8 m below the level of the tunnel invert. The induced horizontal strains at ground level are measured by an invar thread in both longitudinal and transverse directions. Measurements show a specific behaviour of the soil due to its overconsolidated character (K0 greater than 1.5): even though the magnitude of the displacements is limited to a few millimeters, horizontal convergent movements are observed at the level of the tunnel axis while 3 to 4 times smaller heave is measured at ground surface (associated with horizontal extensions). Excavation parameters are automatically recorded and give information on the variation of the torque on the cutting wheel, the advancement rate, the confining pressure, the injection of annular void between soil and the concrete tunnel lining… This paper presents the results of the different monitoring devices and the possible correlations with the tunnel excavation parameters recorded by the TBM.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
6th Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
Missouri University of Science and Technology
Document Version
Final Version
Rights
© 2008 Missouri University of Science and Technology, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Emeriault, Fabrice; Kastner, Richard; and Vanoudheusden, Emilie, "Movements Induced by Tunneling With an Epb Machine in over Consolidated Soils: Compans Monitoring Section of Toulouse Subway Line B" (2008). International Conference on Case Histories in Geotechnical Engineering. 10.
https://scholarsmine.mst.edu/icchge/6icchge/session06/10
Movements Induced by Tunneling With an Epb Machine in over Consolidated Soils: Compans Monitoring Section of Toulouse Subway Line B
Arlington, Virginia
A part of Toulouse’s underground line B has been excavated by a 7.8 meters diameter earth-pressure balance machine. A comprehensive monitoring section has been installed in the Compans garden at a point where the tunnel cover is 12.8-meter and is running through overconsolidated clayey molasses underlying a 6.8 meters layer of made ground and gravels. The monitoring devices give full information on the ground movements above the tunnel and on deformations of the tunnel lining. Vertical movements are measured by 5 multipoint borehole extensometers with automatic data acquisition (every 5 seconds when the TBM crosses the monitoring section). At the end of each excavation phase, a high precision levelling of the borehole extensometer heads is performed in order to determine the total vertical displacements. Horizontal movements are measured by 3 inclinometers, one in the axis of the tunnel and the others on its sides, 2.3 meters away from the tunnel extrados. One of these inclinometers is 42 m long, i.e. 21.8 m below the level of the tunnel invert. The induced horizontal strains at ground level are measured by an invar thread in both longitudinal and transverse directions. Measurements show a specific behaviour of the soil due to its overconsolidated character (K0 greater than 1.5): even though the magnitude of the displacements is limited to a few millimeters, horizontal convergent movements are observed at the level of the tunnel axis while 3 to 4 times smaller heave is measured at ground surface (associated with horizontal extensions). Excavation parameters are automatically recorded and give information on the variation of the torque on the cutting wheel, the advancement rate, the confining pressure, the injection of annular void between soil and the concrete tunnel lining… This paper presents the results of the different monitoring devices and the possible correlations with the tunnel excavation parameters recorded by the TBM.