Location

New York, New York

Date

15 Apr 2004, 4:15pm - 5:30pm

Abstract

Tunnelling was part of the new Tren Urbano transit system in San Juan, Puerto Rico. Four tunnels in soil were designed and constructed with shotcrete linings using the sequential excavation method (SEM), which uses some aspects of the New Austrian Tunneling Method (NATM). Four 6-m-diameter tunnels of about 100 m in length were required to preserve two historic structures located above the subway alignment. Two of the four tunnels were constructed as part of a turnout to a future line. Cover over the SEM tunnels ranges from 20 to 5 m. Some of the tunnels are located less than 1 m from each other in the turnout section. Detailed analysis of the staged construction was undertaken to design shotcrete lining thickness, shotcrete strength, and reinforcing with welded wire fabric and lattice girders. Several variations in lining section were required, which depended on sequence of tunnel excavation and depth of cover. Further refinement of the lining design was possible by considering the initial lining as permanent since it had been constructed with final structure quality requirements. Compensation grouting effectively mitigated ground movements and building settlement was limited. Tunnel lining convergence measurements revealed the lining displacements due to excavation of adjacent or overlying tunnel construction to be within acceptable limits. Design and construction of the tunnels as sequentially excavated with shotcrete support (SEM) was unprecedented in Puerto Rico and not in widespread practice in the continental United States. Further, this was the first major United States underground transit construction project with design-build project delivery.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

5th Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

University of Missouri--Rolla

Document Version

Final Version

Rights

© 2004 University of Missouri--Rolla, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Apr 13th, 12:00 AM Apr 17th, 12:00 AM

Multiple Tunnels in Soil with Shotcrete Linings on Tren Urbano, San Juan, Puerto Rico

New York, New York

Tunnelling was part of the new Tren Urbano transit system in San Juan, Puerto Rico. Four tunnels in soil were designed and constructed with shotcrete linings using the sequential excavation method (SEM), which uses some aspects of the New Austrian Tunneling Method (NATM). Four 6-m-diameter tunnels of about 100 m in length were required to preserve two historic structures located above the subway alignment. Two of the four tunnels were constructed as part of a turnout to a future line. Cover over the SEM tunnels ranges from 20 to 5 m. Some of the tunnels are located less than 1 m from each other in the turnout section. Detailed analysis of the staged construction was undertaken to design shotcrete lining thickness, shotcrete strength, and reinforcing with welded wire fabric and lattice girders. Several variations in lining section were required, which depended on sequence of tunnel excavation and depth of cover. Further refinement of the lining design was possible by considering the initial lining as permanent since it had been constructed with final structure quality requirements. Compensation grouting effectively mitigated ground movements and building settlement was limited. Tunnel lining convergence measurements revealed the lining displacements due to excavation of adjacent or overlying tunnel construction to be within acceptable limits. Design and construction of the tunnels as sequentially excavated with shotcrete support (SEM) was unprecedented in Puerto Rico and not in widespread practice in the continental United States. Further, this was the first major United States underground transit construction project with design-build project delivery.