Location

New York, New York

Date

17 Apr 2004, 10:30am - 12:30pm

Abstract

The complex hydrotechnical works achieved upon the lower basin of the Olt river, within the southern part of Romania, imposed the building of several large reservoirs situated within the geo-morphological unit of the above named river flood plane. During the last years, due to the recent earthquakes that affected Romania, the macro-earthquake zoning of the country was changed. In these conditions, the problem of studying the stability of dikes foundation ground from the liquefaction point of view has raised. The paper presents the survey done in site and laboratory tests performed in order to determine most accurately, the natural ground geotechnical and dynamic parameters as well as an original method in order to estimate the ground liquefaction potential. Finally, the general stability analyses of the assembled dike-foundation ground is presented in pseudo-static hypothesis with taking into account the geotechnical parameters expected in dynamic conditions.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

5th Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

University of Missouri--Rolla

Document Version

Final Version

Rights

© 2004 University of Missouri--Rolla, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Apr 13th, 12:00 AM Apr 17th, 12:00 AM

Liquefaction Potential of the Hydrotechnical Dikes Foundation Ground

New York, New York

The complex hydrotechnical works achieved upon the lower basin of the Olt river, within the southern part of Romania, imposed the building of several large reservoirs situated within the geo-morphological unit of the above named river flood plane. During the last years, due to the recent earthquakes that affected Romania, the macro-earthquake zoning of the country was changed. In these conditions, the problem of studying the stability of dikes foundation ground from the liquefaction point of view has raised. The paper presents the survey done in site and laboratory tests performed in order to determine most accurately, the natural ground geotechnical and dynamic parameters as well as an original method in order to estimate the ground liquefaction potential. Finally, the general stability analyses of the assembled dike-foundation ground is presented in pseudo-static hypothesis with taking into account the geotechnical parameters expected in dynamic conditions.