7. 3m high and 280 m long Manggar Besar homogeneous earthen dam resting on 12. 0 m thick soft silty clay, is under construction to supply water to the city of Balikpapan in Kalimantan island of Indonesia. To accelerate the anticipated 1. 6 m settlement of dam, 30 cm wide strip type drains (Colbond CX 1000) using polyester no-woven fabric are being used 3m centre to centre. It is expected that 70 percent consolidation shall take place within thirteen months of construction by these drains.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
2nd Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
University of Missouri--Rolla
Document Version
Final Version
Rights
© 1988 University of Missouri--Rolla, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Goel, M. C.; Zainiko, Achmad; and Surabaya, J. L., "Colbond Drains for Rapid Consolidation at Manggar Besar Dam" (1988). International Conference on Case Histories in Geotechnical Engineering. 8.
https://scholarsmine.mst.edu/icchge/2icchge/2icchge-session3/8
Colbond Drains for Rapid Consolidation at Manggar Besar Dam
7. 3m high and 280 m long Manggar Besar homogeneous earthen dam resting on 12. 0 m thick soft silty clay, is under construction to supply water to the city of Balikpapan in Kalimantan island of Indonesia. To accelerate the anticipated 1. 6 m settlement of dam, 30 cm wide strip type drains (Colbond CX 1000) using polyester no-woven fabric are being used 3m centre to centre. It is expected that 70 percent consolidation shall take place within thirteen months of construction by these drains.