In recent years slurry cutoff walls have been successfully employed to mitigate seepage and isolate liquid waste and leachate in the groundwater environment. However , a success of the slurry cutoff wall depends on the hydrological condition of the site. A post construction and pre-construction groundwater budget analysis can demonstrate the effectiveness of a slurry cutoff wall. In this paper, a detailed groundwater budget analysis of Loeffel site in the Southwestern Rensselaer County of New York is discussed. The analysis shows that the use of a slurry cutoff wall effectively mitigates the release of contaminated groundwater from the site.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

1st Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

University of Missouri--Rolla

Document Version

Final Version

Rights

© 1984 University of Missouri--Rolla, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
May 6th, 12:00 AM

Effectiveness of a Slurry Cutoff Wall at Loeffel Site

In recent years slurry cutoff walls have been successfully employed to mitigate seepage and isolate liquid waste and leachate in the groundwater environment. However , a success of the slurry cutoff wall depends on the hydrological condition of the site. A post construction and pre-construction groundwater budget analysis can demonstrate the effectiveness of a slurry cutoff wall. In this paper, a detailed groundwater budget analysis of Loeffel site in the Southwestern Rensselaer County of New York is discussed. The analysis shows that the use of a slurry cutoff wall effectively mitigates the release of contaminated groundwater from the site.