Date
08 May 1984, 10:15 am - 5:00 pm
Abstract
The paper presents a comparison of field and analytical data regarding the performance of horizontal drains installed to stabilize a landslide. Results of the comparison provide generalized guidelines with which to design drain spacing, length and position. The most significant conclusions are, firstly, that horizontal drains were able to successfully depressurize a silty fine sand with up to 60% silt; secondly, that the ultimate drawdown that can be achieved by slotted horizontal drains in fine-grained soils is controlled primarily by the elevation of the drain; and thirdly; that the design drain spacing is dependent primarily on the initial drawdown response time.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
1st Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
University of Missouri--Rolla
Document Version
Final Version
Rights
© 1984 University of Missouri--Rolla, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Kleppe, J. H. and Denby, G. M., "Design and Performance of Horizontal Drains" (1984). International Conference on Case Histories in Geotechnical Engineering. 8.
https://scholarsmine.mst.edu/icchge/1icchge/1icchge-theme3/8
Design and Performance of Horizontal Drains
The paper presents a comparison of field and analytical data regarding the performance of horizontal drains installed to stabilize a landslide. Results of the comparison provide generalized guidelines with which to design drain spacing, length and position. The most significant conclusions are, firstly, that horizontal drains were able to successfully depressurize a silty fine sand with up to 60% silt; secondly, that the ultimate drawdown that can be achieved by slotted horizontal drains in fine-grained soils is controlled primarily by the elevation of the drain; and thirdly; that the design drain spacing is dependent primarily on the initial drawdown response time.