Location
Rolla, Missouri
Session Dates
11 Jun 1999 - 17 Jun 1999
Keywords and Phrases
Mexico; Los Olmos Formation; Methane Drainage; Methane Drainage Efficiency; In-Seam Boreholes; Degasification
Abstract
Minerales Monclova S.A. De C.V. (MIMOSA) operates five underground longwall mines in the Gassy Los Olmos Coals of the Sabinas Basin in the state of Coahuila in Northern Mexico. Because of high in-situ gas contents and high cleat and natural fracture permeability, MIMOSA has had to incorporate a system of methane drainage in advance of mining in order to safely and cost effectively exploit their reserves. In the early 1990s Resource Enterprises (REI) conducted reservoir characterization tests, numerical simulations, and Coal Mine Methane (CMM) production tests at a nearby mine property in the same basin. Using this information REI approached MIMOSA and recommended the mine-wide implementation of a degasification system that involves long in-seam directionally drilled boreholes. REI was contracted to conduct the drilling, and to date has drilled over 26,000 m (85,000 ft) of in-seam borehole in advance of mining developments, reducing gas contents significantly below in-situ values. This paper discusses the basis for the degasification program recommended at the MIMOSA mines, and presents the impact of its mine-wide application on MIMOSA's mining operations over the last six years. The paper focuses on the degasification system's impacts on methane emissions into mine workings, coal production, and ventilation demands. It also presents lessons learned by the degasification planners in implementing in-seam methane drainage. The paper presents actual CMM production data, measurements of methane emissions and advance rates at development sections, and mine methane liberations.
Department(s)
Mining Engineering
Meeting Name
8th U.S. Mine Ventilation Symposium
Publisher
University of Missouri--Rolla
Document Version
Final Version
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Brunner, Daniel J. and Ponce, Jose Ruben, "Methane Drainage at the Minerales Monclova Mines in the Sabinas Coal Basin, Coahuila, Mexico" (1999). U.S. Mine Ventilation Symposium. 2.
https://scholarsmine.mst.edu/usmvs/8usmvs/8usmvs-theme4/2
Methane Drainage at the Minerales Monclova Mines in the Sabinas Coal Basin, Coahuila, Mexico
Rolla, Missouri
Minerales Monclova S.A. De C.V. (MIMOSA) operates five underground longwall mines in the Gassy Los Olmos Coals of the Sabinas Basin in the state of Coahuila in Northern Mexico. Because of high in-situ gas contents and high cleat and natural fracture permeability, MIMOSA has had to incorporate a system of methane drainage in advance of mining in order to safely and cost effectively exploit their reserves. In the early 1990s Resource Enterprises (REI) conducted reservoir characterization tests, numerical simulations, and Coal Mine Methane (CMM) production tests at a nearby mine property in the same basin. Using this information REI approached MIMOSA and recommended the mine-wide implementation of a degasification system that involves long in-seam directionally drilled boreholes. REI was contracted to conduct the drilling, and to date has drilled over 26,000 m (85,000 ft) of in-seam borehole in advance of mining developments, reducing gas contents significantly below in-situ values. This paper discusses the basis for the degasification program recommended at the MIMOSA mines, and presents the impact of its mine-wide application on MIMOSA's mining operations over the last six years. The paper focuses on the degasification system's impacts on methane emissions into mine workings, coal production, and ventilation demands. It also presents lessons learned by the degasification planners in implementing in-seam methane drainage. The paper presents actual CMM production data, measurements of methane emissions and advance rates at development sections, and mine methane liberations.