Super Section Speeds Development
Abstract
Now that longwall panels are becoming larger, up to 1,000 ft wide and 8,000 ft long, operators have to shorten the time spent developing the panels. The development can be completed in less time with a super section operation that raises productivity between 700 and 1,200 tons per shift.
Recommended Citation
R. L. Grayson, "Super Section Speeds Development," Coal age, Intertec Publishing, Jan 1985.
Department(s)
Mining Engineering
Document Type
Article - Journal
Document Version
Citation
File Type
text
Language(s)
English
Rights
© 1985 Intertec Publishing, All rights reserved.
Publication Date
01 Jan 1985