Techno-economic Analysis (TEA) Of Partial And Full Electrification Of Clinker Production

Abstract

Process electrification can reduce fossil-fuel consumption and CO2 emissions in cement manufacturing; however, its environmental and economic performance depends strongly on the electricity source. Previous assessments have not consistently accounted for key process-integration requirements, including realistic waste-heat recovery, CO2 purification and capture, plasma-gas recovery, and project-level financial performance. This study integrates Aspen Plus process simulation with energy and emissions accounting, equipment-level cost estimation, discounted cash-flow analysis, and multivariable sensitivity analysis to compare three clinker-production pathways: a conventional fossil-fuel-based plant (Case 1), a partially electrified configuration incorporating an electrified calciner (Case 2), and a fully electrified configuration incorporating an electrified calciner and plasma kiln (Case 3). Gross energy demand increases from 3.91 GJ·tclk−1 in Case 1 to 4.37 and 4.89 GJ·tclk−1 in Cases 2 and 3, respectively, because of electricity-to-heat conversion losses and additional auxiliary electricity requirements. Nevertheless, direct CO2 emissions decrease substantially by approximately 28 % and 38 % in Cases 2 and 3, respectively. When combined with CO2 capture and green electricity, the corresponding net-emission reductions increase to approximately 82 % and 92 %. Although electrification requires greater capital investment, sensitivity analysis shows that its economic viability is governed primarily by electricity source and price, carbon pricing, and capital cost. At a green-electricity price of approximately $ 80 MWh−1, Case 2 becomes economically competitive with Case 1 when the carbon price exceeds approximately $ 60·tCO2−1. Case 3 remains less economically attractive and achieves a positive NPV only under conditions of low electricity prices and stringent carbon pricing. Overall, partial electrification represents the more practical near-term decarbonization pathway, whereas full electrification requires low-cost, low-carbon electricity, stronger policy support, and reductions in capital and operating costs.

Department(s)

Materials Science and Engineering

Second Department

Civil, Architectural and Environmental Engineering

Keywords and Phrases

Cement decarbonization; Electrified calciner; Plasma kiln; Process electrification; Sensitivity analysis

International Standard Serial Number (ISSN)

1873-6785; 0360-5442

Document Type

Article - Journal

Document Version

Citation

File Type

text

Language(s)

English

Rights

© 2026 Elsevier, All rights reserved.

Publication Date

01 Dec 2026

Share

 
COinS