"The object of this investigation was to determine the advantages or disadvantages involved in the use of the IBM Project Management system/360 as a time and cost control tool as compared to the methods presently used by construction contractors in the small to medium size range.
The methods used by three construction contractors were investigated in order to acquire a sample of methods presently used.
It was determined from the investigation that a number of advantages could be obtained which would provide better control of a construction project.
It was also decided that a detailed investigation concerning the cost of installing and using the system must be made in order to determine the feasibility of using the system"--Abstract, page ii.
Advisor(s)
Spooner, James E.
Committee Member(s)
Gerig, Frank A.
Hentzel, David R.
Caruthers, Ricky
Department(s)
Civil, Architectural and Environmental Engineering
Degree Name
M.S. in Civil Engineering
Publisher
University of Missouri--Rolla
Publication Date
1968
Pagination
vii, 156 pages
Note about bibliography
Includes bibliographical references (page 155).
Rights
© 1968 James Donald Bailey, All rights reserved.
Document Type
Thesis - Open Access
File Type
text
Language
English
Subject Headings
Construction industry -- CostsCost control -- Case studiesIBM 360 (Computer)
Thesis Number
T 2130
Print OCLC #
5997996
Electronic OCLC #
794112286
Recommended Citation
Bailey, James Donald, "Construction time and cost control using the IBM Project Management System/360" (1968). Masters Theses. 6699.
https://scholarsmine.mst.edu/masters_theses/6699