Abstract
The seismic stability of the Croton Dam left embankment, was evaluated for potential earthquake ground motions. Field and laboratory test results were used to characterize the static and dynamic properties of the embankment and foundation materials. Results showed liquefaction and strength loss in certain zones of the embankment resulting in large deformation of the slope. Remediation of these areas of the dam was necessary. Various techniques were evaluated including drainage, construction of a berm at toe, vibro-grouted stone columns and compaction grouting. Compaction grouting was selected.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
4th International Conference on Recent Advances in Geotechnical Earthquake Engineering and Soil Dynamics
Publisher
University of Missouri--Rolla
Document Version
Final Version
Rights
© 2001 University of Missouri--Rolla, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Uddin, Nasim and Baltz, J. F., "Seismic Evaluation and Remediation of Embankment Dam" (2001). International Conferences on Recent Advances in Geotechnical Earthquake Engineering and Soil Dynamics. 3.
https://scholarsmine.mst.edu/icrageesd/04icrageesd/session05/3
Included in
Seismic Evaluation and Remediation of Embankment Dam
San Diego, California
The seismic stability of the Croton Dam left embankment, was evaluated for potential earthquake ground motions. Field and laboratory test results were used to characterize the static and dynamic properties of the embankment and foundation materials. Results showed liquefaction and strength loss in certain zones of the embankment resulting in large deformation of the slope. Remediation of these areas of the dam was necessary. Various techniques were evaluated including drainage, construction of a berm at toe, vibro-grouted stone columns and compaction grouting. Compaction grouting was selected.