Abstract

In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a DSAC 1 dam, and started the implementation of one of the largest dam rehabilitation projects in the nation. The construction of the cutoff wall is a key feature of this rehabilitation work to upgrade the dike to current dam safety criteria. The cutoff wall installation is currently being completed on Reach 1, which extends from Port Mayaca to Belle Glade, under a Multiple Task Order Contract based on performance specifications and stringent verification criteria. For the construction of the cutoff wall TREVIICOS selected the self-hardening slurry method. Since the cutoff wall is installed through a layer of highly variable limestone with UCS up to 14,000 psi, the excavation requires the use of the hydromill equipment. This is the first successful application of the hydromill technology with self-hardening slurry in a large scale project in the US. This paper presents the details of the method utilized, the quality control procedures, and the experience gained over seven miles of cutoff wall installed.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

7th Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

Missouri University of Science and Technology

Document Version

Final Version

Rights

© 2013 Missouri University of Science and Technology, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Apr 29th, 12:00 AM May 4th, 12:00 AM

Self Hardening Slurry Wall Installation by Hydromill at The Herbert Hoover Dike – An Innovative Solution

Chicago, Illinois

In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a DSAC 1 dam, and started the implementation of one of the largest dam rehabilitation projects in the nation. The construction of the cutoff wall is a key feature of this rehabilitation work to upgrade the dike to current dam safety criteria. The cutoff wall installation is currently being completed on Reach 1, which extends from Port Mayaca to Belle Glade, under a Multiple Task Order Contract based on performance specifications and stringent verification criteria. For the construction of the cutoff wall TREVIICOS selected the self-hardening slurry method. Since the cutoff wall is installed through a layer of highly variable limestone with UCS up to 14,000 psi, the excavation requires the use of the hydromill equipment. This is the first successful application of the hydromill technology with self-hardening slurry in a large scale project in the US. This paper presents the details of the method utilized, the quality control procedures, and the experience gained over seven miles of cutoff wall installed.