Bloomfield Road Stormwater Storage Tanks, owned by United Utilities PLC, were constructed in 1999 in Blackpool UK to provide 60,000m3 of storage to prevent overflow discharges during the summer bathing water season. The asset comprises two buried tanks (36m diameter and 40m deep) constructed as circular diaphragm walls. Significant groundwater inflows with minor fines content and turbidity up to 48l/s have been reported entering one of the tanks since 2001. From 2008 an increase of fines ingress has been observed indicating potential for progressive failure of the underlying formation strata. The site stratigraphy comprises predominantly glacial superficial soils overlying an interlaminated Mudstone/Gypsum and Halite sequence. Groundwater inflows were likely to have initiated failure mechanisms in the formation strata including fines loss, dissolution of both gypsum and halite and potentially significant voiding. An innovative event tree risk analysis tool was developed to identify and allow a focused remedial works design and a cost effective solution to be planned. The main works implemented comprised: sealing of the base slab joint by resin injection; contact grouting beneath the base; ground investigation works including cross hole tomography geophysics; and grouting within the Mudstone formation. This paper describes the implementation of the project which was completed ahead of programme ensuring continued

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

7th Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

Missouri University of Science and Technology

Document Version

Final Version

Rights

© 2013 Missouri University of Science and Technology, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Apr 29th, 12:00 AM May 4th, 12:00 AM

Bloomfield Road Stormwater Storage Tanks Grouting Works, Blackpool, UK

Chicago, Illinois

Bloomfield Road Stormwater Storage Tanks, owned by United Utilities PLC, were constructed in 1999 in Blackpool UK to provide 60,000m3 of storage to prevent overflow discharges during the summer bathing water season. The asset comprises two buried tanks (36m diameter and 40m deep) constructed as circular diaphragm walls. Significant groundwater inflows with minor fines content and turbidity up to 48l/s have been reported entering one of the tanks since 2001. From 2008 an increase of fines ingress has been observed indicating potential for progressive failure of the underlying formation strata. The site stratigraphy comprises predominantly glacial superficial soils overlying an interlaminated Mudstone/Gypsum and Halite sequence. Groundwater inflows were likely to have initiated failure mechanisms in the formation strata including fines loss, dissolution of both gypsum and halite and potentially significant voiding. An innovative event tree risk analysis tool was developed to identify and allow a focused remedial works design and a cost effective solution to be planned. The main works implemented comprised: sealing of the base slab joint by resin injection; contact grouting beneath the base; ground investigation works including cross hole tomography geophysics; and grouting within the Mudstone formation. This paper describes the implementation of the project which was completed ahead of programme ensuring continued