Location
Chicago, Illinois
Date
02 May 2013, 4:00 pm - 6:00 pm
Abstract
Konkan Railway Corporation Ltd. (KRCL) has been assigned construction of 71 km Railway Line from Katra to Dharam in Jammu & Kashmir state of India. This line when constructed up to Quazigund will link the Kashmir valley with main Indian Railways network. Indian Railway Construction Co. (IRCON) is assigned the section from Dharam to Quazigund. Railway Line in the valley beyond Quazigund is in operation. The KRCL stretch is situated in high mountains and deep gorges requiring construction of large number of tunnels and major bridges. The strata in most of the tunnels is fragile and charged with water particularly in tunnels passing through shear Zones. Several problems were faced while tunnelling which were handled in consultation with experts from all over the world.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
7th Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
Missouri University of Science and Technology
Document Version
Final Version
Rights
© 2013 Missouri University of Science and Technology, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Ralh, Kamal Dev and Ralh, Ansh Deep, "Landslide of Tunnel Face by Slip Circle Formation —Case Study" (2013). International Conference on Case Histories in Geotechnical Engineering. 25.
https://scholarsmine.mst.edu/icchge/7icchge/session03/25
Landslide of Tunnel Face by Slip Circle Formation —Case Study
Chicago, Illinois
Konkan Railway Corporation Ltd. (KRCL) has been assigned construction of 71 km Railway Line from Katra to Dharam in Jammu & Kashmir state of India. This line when constructed up to Quazigund will link the Kashmir valley with main Indian Railways network. Indian Railway Construction Co. (IRCON) is assigned the section from Dharam to Quazigund. Railway Line in the valley beyond Quazigund is in operation. The KRCL stretch is situated in high mountains and deep gorges requiring construction of large number of tunnels and major bridges. The strata in most of the tunnels is fragile and charged with water particularly in tunnels passing through shear Zones. Several problems were faced while tunnelling which were handled in consultation with experts from all over the world.