Abstract
Settlement of a new reinforced concrete channel and related pipes was creatively underpinned and raised utilizing steel mini piles and compaction grout pile elements. The conditions that may have caused the settlement are systematically reviewed and details of construction are presented.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
3rd Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
University of Missouri--Rolla
Document Version
Final Version
Rights
© 1993 University of Missouri--Rolla, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Scherer, Steven D. and Weiner, Ed, "Underpinning and Leveling Settled Pipes and Channel" (1993). International Conference on Case Histories in Geotechnical Engineering. 12.
https://scholarsmine.mst.edu/icchge/3icchge/3icchge-session08/12
Underpinning and Leveling Settled Pipes and Channel
St. Louis, Missouri
Settlement of a new reinforced concrete channel and related pipes was creatively underpinned and raised utilizing steel mini piles and compaction grout pile elements. The conditions that may have caused the settlement are systematically reviewed and details of construction are presented.