Location
St. Louis, Missouri
Date
02 Jun 1993, 2:30 pm - 5:00 pm
Abstract
The remediation of an inactive uranium mill tailings pile at the town of Andujar (Spain) has provided an opportunity to investigate the settlement characteristics of hydraulically-deposited uranium mill tailings. A test embankment was constructed on top of the existing tailings deposit and total stresses, settlements and pore pressures were measured. Settlements and pore pressure data were compared with the results obtained using an elastoplastic numerical model which allows the simulation of two dimensional consolidation processes. Backcalculated consolidation parameters were derived to provide agreement between the calculated and measured settlements and pore pressures. These parameters could then be used to predict the post-construction settlement of the remediated pile.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
3rd Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
University of Missouri--Rolla
Document Version
Final Version
Rights
© 1993 University of Missouri--Rolla, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Santiago, J. L.; Barrera, T.; and Pastor, M., "Large Scale Instrumental Test Embankment on Uranium Tailings" (1993). International Conference on Case Histories in Geotechnical Engineering. 19.
https://scholarsmine.mst.edu/icchge/3icchge/3icchge-session02/19
Large Scale Instrumental Test Embankment on Uranium Tailings
St. Louis, Missouri
The remediation of an inactive uranium mill tailings pile at the town of Andujar (Spain) has provided an opportunity to investigate the settlement characteristics of hydraulically-deposited uranium mill tailings. A test embankment was constructed on top of the existing tailings deposit and total stresses, settlements and pore pressures were measured. Settlements and pore pressure data were compared with the results obtained using an elastoplastic numerical model which allows the simulation of two dimensional consolidation processes. Backcalculated consolidation parameters were derived to provide agreement between the calculated and measured settlements and pore pressures. These parameters could then be used to predict the post-construction settlement of the remediated pile.