This paper describes the field observation of settlement of a raft foundation for a large scale building complex in Nagoya city in Japan. The complex consists of a 28 story hotel, a 15 story office building and a low-storied banquet hall in the middle all of which are supported on a single 80 m square basement on raft foundation. Since the load on the foundation is non-uniform, the differential settlement of the foundation was investigated analytically, taking into consideration the interaction between the ground and the raft. To confirm the validity of the design, measurements were conducted for about 2 years during the building construction. The results of the measurement are discussed below.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

3rd Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

University of Missouri--Rolla

Document Version

Final Version

Rights

© 1993 University of Missouri--Rolla, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Jun 1st, 12:00 AM

A Case History of Raft Foundation Behavior for a Large-Scaled Building Complex

St. Louis, Missouri

This paper describes the field observation of settlement of a raft foundation for a large scale building complex in Nagoya city in Japan. The complex consists of a 28 story hotel, a 15 story office building and a low-storied banquet hall in the middle all of which are supported on a single 80 m square basement on raft foundation. Since the load on the foundation is non-uniform, the differential settlement of the foundation was investigated analytically, taking into consideration the interaction between the ground and the raft. To confirm the validity of the design, measurements were conducted for about 2 years during the building construction. The results of the measurement are discussed below.