Date

03 Jun 1988, 10:30 am - 5:30 pm

Abstract

The paper deals with the monitoring of a geogrid reinforced embankment, 5.0 m high and 600 m long, built to contain additional waste material in the municipal landfill in Modena (Northern Italy). The embankment was founded directly over the waste already placed in the landfill, consisting of' compressible and dishomogeneus material, varying from solid urban waste to muddy industrial material. The geotechnical parameters assumed to characterize the fill soil and the waste material of the foundation soil are described. The settlements of the embankment and the forces and strains in the geogrids were monitored from the beginning of the construction until some months later. The instrumentation used in order to perform this control is described. The actual results are compared with those obtained from the design model and with other field tests concerning geogrid reinforced structures.

Department(s)

Civil, Architectural and Environmental Engineering

Meeting Name

2nd Conference of the International Conference on Case Histories in Geotechnical Engineering

Publisher

University of Missouri--Rolla

Document Version

Final Version

Rights

© 1988 University of Missouri--Rolla, All rights reserved.

Creative Commons Licensing

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Jun 1st, 12:00 AM

Behaviour of a Geogrid Reinforced Embankment over Waste Material

The paper deals with the monitoring of a geogrid reinforced embankment, 5.0 m high and 600 m long, built to contain additional waste material in the municipal landfill in Modena (Northern Italy). The embankment was founded directly over the waste already placed in the landfill, consisting of' compressible and dishomogeneus material, varying from solid urban waste to muddy industrial material. The geotechnical parameters assumed to characterize the fill soil and the waste material of the foundation soil are described. The settlements of the embankment and the forces and strains in the geogrids were monitored from the beginning of the construction until some months later. The instrumentation used in order to perform this control is described. The actual results are compared with those obtained from the design model and with other field tests concerning geogrid reinforced structures.