Accurate monitoring of settlement beneath the main structures of a nuclear power plant not only demonstrates the stability of the structures, but also confirms predicted settlements, thereby verifying the geotechnical parameters used in the design. At the Grand Gulf Nuclear Station near Port Gibson, Mississippi, rebound and settlement monitoring has been continuous since the start of site excavation in 1974. As a result, actual settlements have been shown to be close to the predicted levels. This paper discusses the planning, installation and monitoring of the settlement instrumentation and reviews the factors that were important to the choice of instrumentation.
Department(s)
Civil, Architectural and Environmental Engineering
Meeting Name
1st Conference of the International Conference on Case Histories in Geotechnical Engineering
Publisher
University of Missouri--Rolla
Document Version
Final Version
Rights
© 1984 University of Missouri--Rolla, All rights reserved.
Creative Commons Licensing
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Document Type
Article - Conference proceedings
File Type
text
Language
English
Recommended Citation
Lewis, M. R. and Sanver, A., "Foundation Movement Monitoring of Heavy Structures – A Case History" (1984). International Conference on Case Histories in Geotechnical Engineering. 19.
https://scholarsmine.mst.edu/icchge/1icchge/1icchge-theme9/19
Foundation Movement Monitoring of Heavy Structures – A Case History
Accurate monitoring of settlement beneath the main structures of a nuclear power plant not only demonstrates the stability of the structures, but also confirms predicted settlements, thereby verifying the geotechnical parameters used in the design. At the Grand Gulf Nuclear Station near Port Gibson, Mississippi, rebound and settlement monitoring has been continuous since the start of site excavation in 1974. As a result, actual settlements have been shown to be close to the predicted levels. This paper discusses the planning, installation and monitoring of the settlement instrumentation and reviews the factors that were important to the choice of instrumentation.