Preliminary Geology of the Proffit Mountain Flood Scour, Reynolds County, Missouri

Abstract

The 2.4-km-long Proffit Mountain flood scour formed when the upper reservoir of the Taum Sauk Power Plant, a reversible pumped electric storage facility, failed on 14 December 2005. Approximately 1.3 billion gallons of water drained from the reservoir in roughly 12 minutes, scouring a small tributary on the west flank of Proffit Mountain to bedrock and depositing debris in the valley floor and in the valley of the East Fork of the Black River. the stratigraphic succession exposed includes Mesoproterozoic Taum Sauk Rhyolite and Munger Granite, Cambrian conglomerate and dolomite and flood deposits. the site provides a unique opportunity to study a landscape-scale outcrop. © 2010 the Geological Society of America. All rights reserved.

Department(s)

Geosciences and Geological and Petroleum Engineering

Document Type

Article - Journal

Document Version

Citation

File Type

text

Language(s)

English

Rights

© 2024 GeoScienceWorld, All rights reserved.

Publication Date

01 Jan 2010

Share

 
COinS