Abstract
This paper describes a Lagrangian relaxation-based method to solve the short-term resource scheduling (STRS) problem with ramp constraints. Instead of discretizing the generation levels, the ramp rate constraints are relaxed with the system demand constraints using Lagrange multipliers. Three kinds of ramp constraints, startup, operating and shutdown ramp constraints are considered. The proposed method has been applied to solve the hydro-thermal generation scheduling problem at PG&E. An example alone with numerical results is also presented
Recommended Citation
C. Tseng et al., "Short-Term Resource Scheduling with Ramp Constraints [Power Generation Scheduling]," IEEE Transactions on Power Systems, Institute of Electrical and Electronics Engineers (IEEE), Jan 1997.
The definitive version is available at https://doi.org/10.1109/59.574926
Department(s)
Engineering Management and Systems Engineering
Keywords and Phrases
Lagrange Multipliers; Lagrangian Relaxation Method; Hydro-Thermal Generation Scheduling; Hydrothermal Power Systems; Operating Ramp; Optimisation; Power System Demand Constraints; Power System Planning; Ramp Rate Constraints; Scheduling; Short-Term Power Generation Scheduling; Short-Term Resource Scheduling; Shutdown Ramp; Startup Ramp
International Standard Serial Number (ISSN)
0885-8950
Document Type
Article - Journal
Document Version
Final Version
File Type
text
Language(s)
English
Rights
© 1997 Institute of Electrical and Electronics Engineers (IEEE), All rights reserved.
Publication Date
01 Jan 1997