Non-Critical Transmission Constraints Identification and Removal for Long-Range Production Cost Simulation Performance Improvement

Abstract

Economic transmission planning requires intensive production cost simulations. The long simulation time however presents practical challenges and limits the scope of analyses. This paper therefore investigates transmission constraints, a major contributing factor to simulation time, and proposes a framework to identify and remove transmission constraints that are least critical to simulation results yet can reduce simulation time. Numeric tests using MISO planning models have shown the proposed method can achieve 10∼15% savings in simulation time with acceptable impact to simulation result accuracy. Applying the proposed method may save thousands of computing hours per planning cycle.

Meeting Name

2017 IEEE Power and Energy Society General Meeting, PESGM 2017 (2017: Jul. 16-20, Chicago, IL)

Department(s)

Electrical and Computer Engineering

Research Center/Lab(s)

Intelligent Systems Center

Keywords and Phrases

Economic Transmission Planning; Production Cost Simulation; Security Constrained Economic Dispatch (SCED); Security Constrained Unit Commitment (SCUC); Transmission Constraints

International Standard Book Number (ISBN)

978-153862212-4

International Standard Serial Number (ISSN)

1944-9925

Document Type

Article - Conference proceedings

Document Version

Citation

File Type

text

Language(s)

English

Rights

© 2018 IEEE Computer Society, All rights reserved.

Publication Date

01 Jan 2018

Share

 
COinS