Abstract

The superstructure and instrumentation designs of a three-span bridge are presented in this report. The three spans include a precast box-girder bridge, a precast deck on steel girder and a precast deck on concrete girder. They were designed to compare the performance of various bridge decks reinforced with fiber reinforced polymers (FRP) through field instrumentations. A wireless monitoring system was designed to facilitate the collection of field data after the completion of bridge construction. The collected data will allow the study of FRP bars and stay-in-place FRP grid systems.

Department(s)

Civil, Architectural and Environmental Engineering

Second Department

Electrical and Computer Engineering

Third Department

Computer Science

Sponsor(s)

United States. Department of Transportation
Research and Innovative Technology Administration (RITA)

Comments

United States Department of Transportation Grant No. DTRS98-G-0021

Keywords and Phrases

Bridge design; concrete deck; GFRP bars; bridge instrumentation

Report Number

UTC-R193

Document Type

Technical Report

Document Version

Final Version

File Type

text

Language(s)

English

Rights

© 2010 Center for Transportation Infrastructure and Safety/UTC program, Missouri University of Science and Technology, All rights reserved.

Publication Date

01 Feb 2010

Share

 
COinS