Abstract

Three bridges in Boone County, Missouri - Brown School Road, Coats Lane, and Creasy Springs Bridges - were selected for strengthening with carbon-fiber-reinforced polymer laminates in both shear and flexure. The objective of the rehabilitation program was to remove the 15-ton load posting that had been imposed on each of the bridges. To verify the results of the upgrade, load tests were performed before and after strengthening on two of the bridges - Brown School Road and Coats Lane Bridges. This paper presents the procedures followed in the design, installation, and load testing of the bridges. A recommendation regarding the removal of the load posting is made. © ASCE.

Department(s)

Civil, Architectural and Environmental Engineering

Keywords and Phrases

Bridges; Load tests; Missouri

International Standard Serial Number (ISSN)

1084-0680

Document Type

Article - Journal

Document Version

Citation

File Type

text

Language(s)

English

Rights

© 2024 American Society of Civil Engineers, All rights reserved.

Publication Date

01 Nov 2002

Share

 
COinS