CCFSS Library (1939 - present)

Alternative Title

9th progress report

Abstract

I. SCOPE OF THIS REPORT 1. A stress investigation has been made at the load points of beam E-18-14-88a for spans of 6 and 12 ft. with center load and for spans of 12 ft. with quarter point loading. 2. A similar investigation has been made on beam E-18-12-816a.

Editor(s)

Male, Milton

Department(s)

Civil, Architectural and Environmental Engineering

Sponsor(s)

American Iron and Steel Institute

Research Center/Lab(s)

Wei-Wen Yu Center for Cold-Formed Steel Structures

Publication Date

01 Apr 1940

Document Version

Final Version

Comments

Ninth Progress Report

Document Type

Technical Report

File Type

text

Language(s)

English

Share

 
COinS