"For those seeking information on the cost of producing electricity in steam plants, an unlimited amount of data may be found in the technical journals and text books. This information, however, is obtained from a careful analysis of the daily and hourly records kept by the largest central stations, hence, production costs are available only where the yearly out-put is several million kilowatt-hours. the small isolated stations of from one hundred to two hundred kilowatt capacity have not as a rule, become progressive enough to keep a complete record of operating costs...The test hereinafter reported was conducted from August 3rd. to August 23rd. 1915. This time of year may be taken as a fair average season"--Introduction, page 1.

Advisor(s)

McRae, Austin Lee

Degree Name

B.S. in General Science

Comments

Illustrated by author.

Publisher

Missouri School of Mines and Metallurgy

Publication Date

1916

Pagination

i, 9 pages, 21 plates

Geographic Coverage

Missouri

Rights

© 1916 Bernerd William Adams, All rights reserved.

Document Type

Thesis - Open Access

File Type

text

Language

English

Subject Headings

Electric power-plants -- MissouriElectricity -- Case studies -- Costs

Thesis Number

T 463

Print OCLC #

9486803

Electronic OCLC #

369203699

Share

 
COinS