Two-level underground part of 12-storeyed dwelling building was constructed in the historical center of Moscow in 2000. The strengthening of foundations was carried out by pressing in of tubular and concrete piles or by placing of bore and injection piles, depending on the results of mathematical modeling. Geotechnical monitoring of the adjacent buildings was carried out in the process of strengthening and new construction. The results of monitoring confirmed the correct way of the chosen solutions: the settlements did not exceed the ultimate permissible values.

Department(s)

Civil, Architectural and Environmental Engineering

Appears In

International Conference on Case Histories in Geotechnical Engineering

Meeting Name

Fifth Conference

Publisher

University of Missouri--Rolla

Publication Date

4-13-2004

Document Version

Final Version

Rights

© 2004 University of Missouri--Rolla, All rights reserved.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Apr 13th, 12:00 AM Apr 17th, 12:00 AM

The Experience of Reinforcement of Existing Buildings During Construction in Conditions of Compact Urban Planning

New York, New York

Two-level underground part of 12-storeyed dwelling building was constructed in the historical center of Moscow in 2000. The strengthening of foundations was carried out by pressing in of tubular and concrete piles or by placing of bore and injection piles, depending on the results of mathematical modeling. Geotechnical monitoring of the adjacent buildings was carried out in the process of strengthening and new construction. The results of monitoring confirmed the correct way of the chosen solutions: the settlements did not exceed the ultimate permissible values.