The remediation of an inactive uranium mill tailings pile at the town of Andujar (Spain) has provided an opportunity to investigate the settlement characteristics of hydraulically-deposited uranium mill tailings. A test embankment was constructed on top of the existing tailings deposit and total stresses, settlements and pore pressures were measured. Settlements and pore pressure data were compared with the results obtained using an elastoplastic numerical model which allows the simulation of two dimensional consolidation processes. Backcalculated consolidation parameters were derived to provide agreement between the calculated and measured settlements and pore pressures. These parameters could then be used to predict the post-construction settlement of the remediated pile.

Department(s)

Civil, Architectural and Environmental Engineering

Appears In

International Conference on Case Histories in Geotechnical Engineering

Meeting Name

Third Conference

Publisher

University of Missouri--Rolla

Publication Date

6-1-1993

Document Version

Final Version

Rights

© 1993 University of Missouri--Rolla, All rights reserved.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Jun 1st, 12:00 AM

Large Scale Instrumental Test Embankment on Uranium Tailings

St. Louis, Missouri

The remediation of an inactive uranium mill tailings pile at the town of Andujar (Spain) has provided an opportunity to investigate the settlement characteristics of hydraulically-deposited uranium mill tailings. A test embankment was constructed on top of the existing tailings deposit and total stresses, settlements and pore pressures were measured. Settlements and pore pressure data were compared with the results obtained using an elastoplastic numerical model which allows the simulation of two dimensional consolidation processes. Backcalculated consolidation parameters were derived to provide agreement between the calculated and measured settlements and pore pressures. These parameters could then be used to predict the post-construction settlement of the remediated pile.