The paper deals with a tunnel structure which has been designed in a very economic way, taking account of best estimate ground parameters and high sophisticated numerical models for simulating the reinforced concrete behaviour. Some changes were made during construction of the tunnel, to speed up the construction procedure. During the backfill of the tunnel higher displacements than calculated occurred.

Department(s)

Civil, Architectural and Environmental Engineering

Appears In

International Conference on Case Histories in Geotechnical Engineering

Meeting Name

Third Conference

Publisher

University of Missouri--Rolla

Publication Date

6-1-1993

Document Version

Final Version

Rights

© 1993 University of Missouri--Rolla, All rights reserved.

Document Type

Article - Conference proceedings

File Type

text

Language

English

Share

 
COinS
 
Jun 1st, 12:00 AM

Cut and Cover at Landrückentunnel North

St. Louis, Missouri

The paper deals with a tunnel structure which has been designed in a very economic way, taking account of best estimate ground parameters and high sophisticated numerical models for simulating the reinforced concrete behaviour. Some changes were made during construction of the tunnel, to speed up the construction procedure. During the backfill of the tunnel higher displacements than calculated occurred.