Abstract
Control of integrated photovoltaic (PV) plants with energy storage systems (ESSs) has become an important research and development topic in recent times. In this context, a Multi-port Autonomous Reconfigurable Solar (MARS) plant that integrates PV and ESS to alternating current transmission grid and high-voltage direct current (HVdc) link is studied in this paper. With penetration of power electronic based resources in the grid, the grid's capability to recover from frequency or voltage disturbances are reduced. Therefore, one of the vital objectives of any new grid integrated power electronic resource is to provide advanced control functions like voltage and frequency support to the grid during disturbances. In this research work, a detailed implementation of a synchronverter-based control algorithm of MARS is presented. The proposed control algorithm and the MARS control architecture are evaluated through simulations on PSCAD/EMTDC simulation platform to showcase the performance in different operating conditions. In addition, they are evaluated in Opal-RT offline simulation models which can also be used to perform control-hardware-in-the-loop (cHIL) tests.
Recommended Citation
P. R. Marthi et al., "Synchronverter-Based Control of Multi-Port Autonomous Reconfigurable Solar Plants (MARS)," ECCE 2020 - IEEE Energy Conversion Congress and Exposition, pp. 5019 - 5026, article no. 9236019, Institute of Electrical and Electronics Engineers, Oct 2020.
The definitive version is available at https://doi.org/10.1109/ECCE44975.2020.9236019
Department(s)
Electrical and Computer Engineering
Keywords and Phrases
ESS; HVdc; PV; Synchronverter; VSG
International Standard Book Number (ISBN)
978-172815826-6
Document Type
Article - Conference proceedings
Document Version
Citation
File Type
text
Language(s)
English
Rights
© 2024 Institute of Electrical and Electronics Engineers, All rights reserved.
Publication Date
11 Oct 2020
Comments
U.S. Department of Energy, Grant 34019