Regional and Inter-Regional Transmission Planning and Cost Allocation

Abstract

This paper provides a brief overview on FERC Order 1000 and MISO value-based planning process. The focus of this paper is to provide the concepts of two distinct cost allocation methodologies, economic benefit based and transmission usage based, which could be used as potential prototypes for FERC Order 1000 compliance.

Meeting Name

2012 IEEE Power and Energy Society General Meeting, PES 2012 (2012: Jul. 22-26, San Diego, CA)

Department(s)

Electrical and Computer Engineering

Keywords and Phrases

Compliance; Cost Allocation; FERC Order 1000; Inter-Regional; Power Markets; Regional; Transmission Planning; Cost Accounting; Energy Policy; Planning; Electric Power Transmission

International Standard Book Number (ISBN)

978-1467327275

International Standard Serial Number (ISSN)

1944-9925

Document Type

Article - Conference proceedings

Document Version

Citation

File Type

text

Language(s)

English

Rights

© 2012 Institute of Electrical and Electronics Engineers (IEEE), All rights reserved.

Publication Date

01 Jul 2012

Share

 
COinS