Alternative Title

Flintshire Furnace

Abstract

"It is required to furnish plans, specifications and estimate for a Flintshire furnace, capable of smelting 2100 pounds of good galena, per shift of 8 hours. Give two drawings showing elevation and plan, drawn to a scale of 1/2 inch to the foot.

Fire brick, red brick and iron to be shown in colors. Estimates must cover both iron and brick work"--Problem to be Solved, page 2.

Department(s)

Materials Science and Engineering

Degree Name

Professional Degree in Metallurgical Engineering

Publisher

Missouri School of Mines and Metallurgy

Publication Date

1888

Pagination

14 pages, 3 plates

Rights

© 1888 H. H. Schwarz, All rights reserved.

Document Type

Thesis - Open Access

File Type

text

Language

English

Library of Congress Subject Headings

Smelting furnaces

Thesis Number

T 122

Print OCLC #

5924008

Electronic OCLC #

489516058

Comments

Holograph [Handwritten in entirety by author].

Download includes a transcription of this handwritten thesis.

Included in

Metallurgy Commons

Share

 
COinS