Abstract: Operator practices have long been suspected to contribute towards the inefficient use of cable shovels. The objective of this work is to find the optimal crowd arm and hoist rope speeds for given initial conditions, material properties and uncertain bulk densities. The excavation process has been modeled using shovel kinematics and dynamics and includes dynamic shovel payload and material cutting resistance models using geometric simulation and passive soil pressure techniques. The models have been used to simulate the energy per unit loading rate of the P&H 2100BL shovel. Extended simulations were carried out for crowd arm and hoist rope speeds ranging from 0.25 to 0.5 m s−1 and 0.5 to 0.7 m s−1, respectively. From the results, the optimal crowd arm and hoist rope speeds were found to be 0.25 and 0.7 m s−1, respectively. The objective function value was 0.2111 kJ s/kg with a standard deviation of 0.0161 kJ s/kg. At 95% confidence, the energy per unit loading rate lies within 0.1795 and 0.2428 kJ s/kg. The study also shows that the optimal operating conditions yield an average of 2.5 million tonnes/annum more than the non-optimal conventional operation.
Type: Article - Journal
text
In Title: Mechanism and Machine Theory
Copyright Notice: This material is presented to ensure timely dissemination of scholarly and technical work. Copyright and all rights therein are retained by authors or by other copyright holders. All persons copying this information are expected to adhere to the terms and constraints invoked by each author's copyright. In most cases, these works may not be reposted without the explicit permission of the copyright holder.
FULL COPYRIGHT INFORMATION:
http://www.elsevier.com/wps/find/authorsview.authors/authorsrights
Publisher URL:
http://dx.doi.org/10.1016/j.mechmachtheory.2006.07.008
Link to this page:
http://scholarsmine.mst.edu/post_prints/CableShovelDiggingOptimizationForEnergyEfficien_09007dcc804faf13.html



titleCable shovel digging optimization for energy efficiency
contributor.authorAwuah-Offei, Kwame
contributor.authorFrimpong, Samuel
contributor.deptlabMining & Nuclear Engineering
subjectcable shovel excavation
subjectdigging optimization
subjectdynamics
subjectsimulation
date.issued2007
publisherElsevier
identifier.citationAwuah-Offei, Kwame and Frimpong, Samuel (2007), “Cable Shovel Digging Optimization for Energy Efficiency”, Mechanism and Machine Theory, Vol. 42 (8), Elsevier Science Ltd., Great Britain pp. 995-1006
identifier.pub.URI
http://dx.doi.org/10.1016/j.mechmachtheory.2006.07.008
description.abstractOperator practices have long been suspected to contribute towards the inefficient use of cable shovels. The objective of this work is to find the optimal crowd arm and hoist rope speeds for given initial conditions, material properties and uncertain bulk densities. The excavation process has been modeled using shovel kinematics and dynamics and includes dynamic shovel payload and material cutting resistance models using geometric simulation and passive soil pressure techniques. The models have been used to simulate the energy per unit loading rate of the P&H 2100BL shovel. Extended simulations were carried out for crowd arm and hoist rope speeds ranging from 0.25 to 0.5 m s−1 and 0.5 to 0.7 m s−1, respectively. From the results, the optimal crowd arm and hoist rope speeds were found to be 0.25 and 0.7 m s−1, respectively. The objective function value was 0.2111 kJ s/kg with a standard deviation of 0.0161 kJ s/kg. At 95% confidence, the energy per unit loading rate lies within 0.1795 and 0.2428 kJ s/kg. The study also shows that the optimal operating conditions yield an average of 2.5 million tonnes/annum more than the non-optimal conventional operation.
typeArticle - Journal
type.DCMITypetext
type.statusPostprint
rightsThis material is presented to ensure timely dissemination of scholarly and technical work. Copyright and all rights therein are retained by authors or by other copyright holders. All persons copying this information are expected to adhere to the terms and constraints invoked by each author's copyright. In most cases, these works may not be reposted without the explicit permission of the copyright holder.
rights.URI
http://www.elsevier.com/wps/find/authorsview.authors/authorsrights
relation.isPartOfMechanism and Machine Theory
date.accessioned2007-04-11T17:00:48Z
date.available2008-05-09T17:14:20Z
identifier.persist.URI
http://scholarsmine.mst.edu/post_prints/CableShovelDiggingOptimizationForEnergyEfficien_09007dcc804faf13.html