Description

The INSPIRE UTC, with permission and the cooperation of Missouri S&T Facilities Operations, is conducting research testing on the Computer Science Pedestrian Bridge through the end of September 2018. The technologies employed in the Pedestrian Bridge test include: microwave imaging, ground penetrating radar and impact-echo tests, hyperspectral, and thermal imaging.

Start Date

8-14-2018 5:10 PM

End Date

8-14-2018 5:50 PM

Department(s)

Civil, Architectural and Environmental Engineering

Comments

Outside the Computer Science Bldg.
Demonstration of INSPIRE UTC Technologies used to Inspect the Computer Science Pedestrian Bridge at Missouri S&T

Photos associated with the project are available as supplemental files and are also shown in a slide show below.

Document Type

Presentation

Document Version

Final Version

File Type

text

Language(s)

English

Rights

© 2018 Missouri University of Science and Technology, All rights reserved.

Bridge-1.jpg (18704 kB)
Test-1-portrait.jpg (922 kB)
Test-2-portrait.jpg (2495 kB)
Test-3.jpg (14074 kB)
Test-4.jpg (14249 kB)
Test-5.jpg (13775 kB)
UAVTest-4.jpg (16299 kB)
UAVTest-4-portrait.jpg (2414 kB)

Share

COinS
 
Aug 14th, 5:10 PM Aug 14th, 5:50 PM

Pedestrian Bridge Test Demonstration

The INSPIRE UTC, with permission and the cooperation of Missouri S&T Facilities Operations, is conducting research testing on the Computer Science Pedestrian Bridge through the end of September 2018. The technologies employed in the Pedestrian Bridge test include: microwave imaging, ground penetrating radar and impact-echo tests, hyperspectral, and thermal imaging.

Pedestrian Bridge Test Demonstration