Diversion Tunnel of a Hydroelectric Plant on Nestos River (Greece). a Case Study

T. Makedon, Aristotle University of Thessaloniki, Greece
C. Marangos, University of Thessaloniki, Greece
G. Dimopoulos, Aristotle University of Thessaloniki, Greece

This paper has been relocated to http://scholarsmine.mst.edu/icchge/3icchge/3icchge-session06/3/

There were no downloads as of 6/1/2016.

Abstract

A complete description of ~ geological and geotechnical investigation for the construction of a d~version tunnel in .Platanovrisl. dam area, East Macedonia, Greece is given. The numerical stress analys1s and stress fa1.lure analysis results are presented, along with results of structurally control~ed failure modes. The requirements for the application of the method are described. The conclus1ons from the application of the failure criterion, as well as the comparison between the analysis and the actual construction results have been discussed.

 
Jun 1st, 12:00 AM Jun 4th, 12:00 AM

Diversion Tunnel of a Hydroelectric Plant on Nestos River (Greece). a Case Study

A complete description of ~ geological and geotechnical investigation for the construction of a d~version tunnel in .Platanovrisl. dam area, East Macedonia, Greece is given. The numerical stress analys1s and stress fa1.lure analysis results are presented, along with results of structurally control~ed failure modes. The requirements for the application of the method are described. The conclus1ons from the application of the failure criterion, as well as the comparison between the analysis and the actual construction results have been discussed.