Alternative Title

31st progress report

Abstract

I. SCOPE OF THIS REPORT (a) Twenty tension tests were carried out on specimens cut from the steel of which those beams were fabricated for which tension tests are not inculded in the 27th Report. This completes the tension tests for the present series of beams. (b) A start was made in the final evaluation of the results of the beam tests. The part of the evaluation completed to date is included in this report.

Editor(s)

Male, Milton

Department(s)

Civil, Architectural and Environmental Engineering

Research Center/Laboratory(s)

Wei-Wen Yu Center for Cold-Formed Steel Structures

Sponsor(s)

American Iron and Steel Institute

Publisher

Unknown

Publication Date

2-1-1943

Document Version

Final Version

Comments

Thirty-First Progress Report