Alternative Title

34th progress report

Abstract

I. SCOPE OF THIS REPORT (1) Twenty-six tension tests were carried out on specimens cut from the steel from which the beams of the present series were formed. (2) Two specimens of beam 6 - 3 - 16 were tested in the same manner as described in the preceding report. These are replacement specimens furnished by the manufacturer for two beams damaged in the original shipment. (3) The greater part of the evaluation of the results of all twenty-six beam tests was completed and the entire evaluation will be discussed in the next report.